CALL US
01625-573-454

Product was successfully added to your shopping cart.
3600

William Bloy

PRODUCT CODE - WIBL001

Be the first to review this product

Bespoke Quote

Availablity:
|
brand: No
|
Price:

Regular Price: £3,626.12

Special Price £2,427.42 Incl. Tax: £2,912.90

Availability: In stock


 

Regular Price: £3,626.12

Special Price £2,427.42 Incl. Tax: £2,912.90

With everything in the kit that you need, installing the system is simple, easy and straightforward.

What’s included?
The panels are laid on screed flooring or floorboards and then the piping installed
High strength piping – WRAS approved, Pex-Al-Pex plastic piping – that doesn’t split when cut and can withstand changes in temperature and pressure
Energy efficient Grundfos 3 speed heat pump
Dualmix manifold with high calibre components
Easy to use room thermostat for responsive control of heat
Specialist tools including reaming tool for secure, leak proof connection between piping and clips for secure fastening.

Kit contents:
– Temperature control and pump unit [x2]
– 11 Zone Dualmix Manifold -- Including: Manifold Isolating Valves x 2 - Temperature Guage x 2 - Lockshields with flow meters on each port - Drain/fill valves with blank cap x 2 - Automatic air vent x 2 - Metal fixing brackets x 2
– 3 Zone Dualmix Manifold -- Including: Manifold Isolating Valves x 2 - Temperature Guage x 2 - Lockshields with flow meters on each port - Drain/fill valves with blank cap x 2 - Automatic air vent x 2 - Metal fixing brackets x 2
– Pex-Al-Pex Pipe [1000]
– Pipe Reamer
– Connector Cores [x28]
– Heatmiser Digital Programmable Thermostat [x8]
– 1200mmx600mmx25mm eps300 Solid Tile Direct Panels [x47]
– Multi-Zone Wiring Centre [x2]
– Insulation Roll [x150m]
– Actuator [x14]
– Sensor Probe and Housing Unit


Need help and expert advice?
With Underfloor Heating Trade Supplies, everything you need is only a click or a phone call away, including expert hints and tips to make installation and operation of underfloor heating system smoother.

Email us on info@underfloorheatingtradesupplies.co.uk or call our friendly team on 01625 573454

Installation

 

-- Remove all contaminants, dirt, grease etc from the substrate and make dust free.
-- Loose lay the boards across the floor and number the boards on the upper face to identify position of each board, making sure the pipework runs are calculated correctly to reach manifold position.
-- Uplift the numbered boards and prime the underside of the boards with Ultra Floor Prime-IT MSP bonding primer. This should be applied by brush or roller in a thin film. Allow to thoroughly dry to a clear green film ensuring primed face does not come into contact with other boards, walls or subfloor until it is ready to be bedded.
- -Drying time will depend upon ambient conditions but is typically between 1 and 4 hours.
-- Whilst the primer on the boards is drying commence with priming of the substrate using UltraFloor Prime-IT MSP. The primer should be diluted 3 parts water to 1 part primer and allowed to fully dry.
-- Apply flexible tile adhesive to the subfloor using a notched trowel to give a minimum 3mm adhesive bed. Bed the boards, primed side down, into the adhesive and ensure compression of adhesive ridges, ensure full compression of the adhesive to give a void free full adhesive bed. Additional use of  screws and washers is recommended over timber substrates where needed, fixed at every 300mm. Allow to cure for approximately 4 hours to ensure the adhesive has gone through its initial set before carrying out any further works.
-- Pipe work may be fitted into the boards once they are all secure. Where possible this is best left until the following day. It is recommended that the pipe system is checked for leaks and correct water pressures prior to tiling over.
-- Prime the upper face of the boards with Ultra Prime-IT MSP bonding primer. This should be applied by brush or roller in a thin film. Allow to thoroughly dry to a clear green film, (approx 1-4 hours).
-- Apply Ultra Floor Level-iT 2 two part smoothing compound over entire floor area, making sure all voids and gaps are completely filled, the levelling compound should encapsulate the whole floor and cover the board with a 5mm layer on top.
-- Allow to cure for 24 hours prior to carrying out any tiling. Cold and/or humid atmospheres will delay the curing of Level-iT 2 so allowances should be made accordingly.
-- Prime the cured Level-iT 2 using Ultra Floor Prime-IT MSP diluted with 3 parts water to 1 part primer. Allow to thoroughly dry.

  1. Be the first to review this product

Write Your Own Review

How do you rate this product? *

  1 star 2 stars 3 stars 4 stars 5 stars
Rating
This site uses cookies. By continuing to browse this site you are agreeing to our use of cookies. Read More...