CALL US
01625-573-454

Product was successfully added to your shopping cart.
3600

Jiggy Lloyd

PRODUCT CODE -

Be the first to review this product

Bespoke Quote

Availablity:
|
brand: No
|
Price:

Regular Price: £4,734.06

Special Price £3,159.24 Incl. Tax: £3,791.09

Availability: In stock


 


To get the best from underfloor heating, you need floor installation and an underfloor heating kit with the very best, professional grade components that make for hassle-free, no maintenance system

And we have just the kit for you.

Everything included
Branded, professional standard components and equipment are instrumental in easy installation, as well as hassle-free operation of the underfloor heating systems.

This is why our kits contain only the best, including;

High strength, easy to cut Pex-Al-Pex plastic piping that does not split
7 Zone Dualmix manifold, with high quality components including Dualmix manifold with isolating valves, temperature gauges, lock shield with flow metres on each port, drain and fill valves with blank cap, automatic air vents and metal fixing brackets
A+ rated Grundfos 3 Speed circulation pump unit that uses little energy to pump out the heat you need
Easy-to-use and read thermostat for accurate temperature settings
Specialist tool ensuring reamed pipe secure fits with manifold connectors, preventing sub floor leaks

Kit contents:
– Temperature control and pump unit
– 7 Zone Dualmix Manifold -- Including: Manifold Isolating Valves x 2 - Temperature Guage x 2 - Lockshields with flow meters on each port - Drain/fill valves with blank cap x 2 - Automatic air vent x 2 - Metal fixing brackets x 2
– Pex-Al-Pex Pipe [700]
– Connector Cores [x14]
– Multi Surface Primer [x2]
– Solid Floor Panel [x90]
– Self Levelling Compound [x55]
– Slimline Thermostat
– Pipe Reamer

Order today

Order online using our secure check out or opt for PayPal payment. Need more advice or not sure you have everything you need? Call our expert team on 01625 573454 or why not email us info@underfloorheatingtradesupplies.co.uk

Installation

-- Remove all contaminants, dirt, grease etc from the substrate and make dust free.

-- Loose lay the boards across the floor and number the boards on the upper face to identify position of each board, making sure the pipework runs are calculated correctly to reach manifold position.

-- Uplift the numbered boards and prime the underside of the boards with Ultra Floor Prime-IT MSP bonding primer. This should be applied by brush or roller in a thin film. Allow to thoroughly dry to a clear green film ensuring primed face does not come into contact with other boards, walls or subfloor until it is ready to be bedded.

--Drying time will depend upon ambient conditions but is typically between 1 and 4 hours. -- Whilst the primer on the boards is drying commence with priming of the substrate using UltraFloor Prime-IT MSP. The primer should be diluted 3 parts water to 1 part primer and allowed to fully dry.

-- Apply flexible tile adhesive to the subfloor using a notched trowel to give a minimum 3mm adhesive bed. Bed the boards, primed side down, into the adhesive and ensure compression of adhesive ridges, ensure full compression of the adhesive to give a void free full adhesive bed. Additional use of screws and washers is recommended over timber substrates where needed, fixed at every 300mm. Allow to cure for approximately 4 hours to ensure the adhesive has gone through its initial set before carrying out any further works.

-- Pipe work may be fitted into the boards once they are all secure. Where possible this is best left until the following day. It is recommended that the pipe system is checked for leaks and correct water pressures prior to tiling over. -- Prime the upper face of the boards with Ultra Prime-IT MSP bonding primer. This should be applied by brush or roller in a thin film. Allow to thoroughly dry to a clear green film, (approx 1-4 hours).

-- Apply Ultra Floor Level-iT 2 two part smoothing compound over entire floor area, making sure all voids and gaps are completely filled, the levelling compound should encapsulate the whole floor and cover the board with a 5mm layer on top.

-- Allow to cure for 24 hours prior to carrying out any tiling. Cold and/or humid atmospheres will delay the curing of Level-iT 2 so allowances should be made accordingly. -- Prime the cured Level-iT 2 using Ultra Floor Prime-IT MSP diluted with 3 parts water to 1 part primer. Allow to thoroughly dry.

  1. Be the first to review this product

Write Your Own Review

How do you rate this product? *

  1 star 2 stars 3 stars 4 stars 5 stars
Rating
This site uses cookies. By continuing to browse this site you are agreeing to our use of cookies. Read More...